MODEL HUAC-TRC

Battery-Powered Transformer Loss and Capacity Tester

Battery-powered transformer capacity and loss tester with built-in three-phase source: capacity, no-load and load loss, impedance voltage, 4.5 kg.

  • Capacity test with no external power: built-in battery and three-phase source
  • More than 100 transformers per charge
  • No-load and load loss, impedance voltage with external supply: up to 750 V, 100 A
  • Automatic correction for waveform, temperature and non-rated conditions
  • Range extension with external VTs and CTs
  • Estimates the performance class of three-phase oil-immersed transformers from measured losses
  • English user interface; English operating system available

Overview

The HUAC-TRC combines a transformer capacity tester and a transformer characteristic tester in one 4.5 kg instrument. A built-in rechargeable battery and a precision three-phase 50 Hz sine-wave source let it measure transformer capacity without any external three-phase supply, regulator or current booster. One charge is enough for more than 100 transformers.

With an external supply and regulator it also measures no-load current, no-load loss, impedance voltage and load loss, with voltage up to 750 V and current up to 100 A. All results are corrected automatically for waveform distortion, temperature and non-rated voltage and current.

See the full range of transformer test equipment, or send us your transformer data and we will recommend the right instrument.

Technical specifications

Built-in source
Voltage0 – 10 V
Current0 – 10 A
Capacity test
Range20 – 65,000 kVA
Characteristic test
Voltage0 – 750 V
Current0 – 100 A
Accuracy
Voltage, current±0.2 %
Power±0.5 % (cos φ > 0.1); ±1.0 % (0.02 < cos φ < 0.1)
General
Charger input160 – 265 V AC
Insulation≥ 100 MΩ to chassis; 2 kV for 1 min at charger input
Dimensions320 × 250 × 120 mm
Weight4.5 kg
Interface languageEnglish

Specifications may change without notice. Contact us for the latest datasheet.

Applications

Distribution transformersPower transformersField capacity checksLoss measurement

Downloads

The datasheet and user manual for this instrument are sent on request, usually within one business day.

Frequently asked questions

Does it need a three-phase supply for the capacity test?

No. The built-in battery and three-phase 50 Hz source supply the test signal, so no external supply, regulator or booster is needed.

What does it need for no-load and load loss tests?

An external power supply and voltage regulator, plus a step-up or step-down unit where needed. The instrument measures up to 750 V and 100 A directly, and more with external VTs and CTs.

How many tests per charge?

More than 100 transformers on one full charge.

Have another question? Ask our application engineers.

Request a quote

Get pricing for the Battery-Powered Transformer Loss and Capacity Tester

Tell us the asset ratings and site conditions. A sales engineer will reply with a recommendation and quotation.

  1. We reply within one business dayA sales engineer reads your request and asks for anything missing.
  2. You get a recommendationThe right model and options, with a datasheet and quotation.
  3. No obligationAsk about lead time, shipping and payment terms before you decide.

By submitting, you agree to our Privacy Policy. We use your details only to answer this request.

Related products

Often ordered together

All Transformer Testing →
WhatsApp Get a quote
WhatsApp