Three-Phase Transformer Turns Ratio Tester (TTR), Battery Powered
Battery-powered three-phase TTR tester: ratio, vector group and polarity in about 10 seconds with one connection, ratio 0.9 to 10,000, 3.5 kg.
Test methods per IEC 60076
Test methods per IEC 62271-100
Test methods per IEEE 400.2 · IEC 60502
Test methods per IEC 60060-1 · IEC 60270
Test methods per IEC 60255 · IEC 61850
Test methods per IEC 61869
Test methods per IEEE 81
Test methods per IEC 60896
OLTC analyzer for transition time, transition resistance, waveform and three-phase synchronism, with automatic fault marking, touch screen and Word reports.
The HUAC-BYKC-III tests the switching sequence and timing of transformer on-load tap changers (OLTCs). It measures transition time, transition waveform, transition resistance and three-phase synchronism, following DL/T 846.8.
Analysis is automatic: the instrument identifies faults in the waveform and marks them, and adjusts the resistance and time scales to the recorded data. Tests can be made with or without the windings connected, and continuous testing shortens transformer outages.
See the full range of transformer test equipment, or send us your transformer data and we will recommend the right instrument.
| Output | |
|---|---|
| Charging current | 3 A / 1 A range; 0.6 A / 0.2 A range |
| Max. port voltage | 24 V |
| Measurement | |
| Transition resistance | 0.4 – 20 Ω (1 A); 10 – 100 Ω (0.2 A) |
| Recording time | 300 ms |
| Sampling rate | 30 kHz |
| Resolution | |
| Time / resistance | 0.1 ms / 0.1 Ω |
| Accuracy | |
| Transition resistance | ±5 % of reading ±0.1 Ω |
| Transition time | ±0.5 % of reading ±0.2 ms |
| Environment | |
| Operating conditions | -10 – 40 °C, RH < 85 % |
| General | |
| Interface language | English |
Specifications may change without notice. Contact us for the latest datasheet.
The datasheet and user manual for this instrument are sent on request, usually within one business day.
The tap changer is the only moving part in the transformer circuit. Measuring the transition sequence, time and resistance finds worn contacts, broken transition resistors and timing faults before they cause a failure.
No. The tester works with or without the windings connected.
Y0, Y and Δ; for Δ transformers the three-phase synchronism is also displayed.
Have another question? Ask our application engineers.
Request a quote
Tell us the asset ratings and site conditions. A sales engineer will reply with a recommendation and quotation.
Related products
Battery-powered three-phase TTR tester: ratio, vector group and polarity in about 10 seconds with one connection, ratio 0.9 to 10,000, 3.5 kg.
Fully automatic three-phase turns ratio tester with colour screen and blind test: ratio, vector group and polarity, ratio up to 10,000, battery or AC powered.
Single- and three-phase transformer turns ratio tester with vector group, blind test and built-in thermal printer. Ratio 0.9 to 5000, 4 kg, 220 V AC.
Request a quote
A sales engineer replies within one business day.Or emailsales@huactester.com.