MODEL HUAC-KC-2008

Portable On-Load Tap Changer Tester

Lightweight 5 kg OLTC tester for transition waveform, time, resistance and three-phase synchronism, with 5.7-inch screen and USB storage.

  • High output current in a 5 kg instrument
  • Two current ranges for a wider measuring range
  • Automatic calculation of transition resistance and time
  • Comprehensive protection circuits
  • 5.7-inch LCD for field use
  • USB storage for data and waveforms; keypad and rotary knob
  • English user interface; English operating system available

Overview

The HUAC-KC-2008 measures the key parameters of transformer on-load tap changers: transition waveform, transition time, transition resistance and three-phase synchronism. It calculates transition resistance and time automatically.

Two current ranges give a wider measuring range with stable readings, and at 5 kg the instrument is easy to take up to the transformer.

See the full range of transformer test equipment, or send us your transformer data and we will recommend the right instrument.

Technical specifications

Output
Test current1.0 A, 0.5 A
Measurement
Transition resistance0.5 – 20 Ω (1.0 A); 0.5 – 40 Ω (0.5 A)
Transition time2 – 250 ms
Accuracy
Transition resistance±(5 % of reading + 3 digits)
Transition time±(0.1 % of reading + 3 digits)
Data
StorageInternal memory and USB flash drive
General
Dimensions345 × 295 × 175 mm
Weight5 kg
Interface languageEnglish

Specifications may change without notice. Contact us for the latest datasheet.

Applications

On-load tap changersField maintenancePower transformers

Downloads

The datasheet and user manual for this instrument are sent on request, usually within one business day.

Frequently asked questions

What does it measure?

Transition waveform, transition time, transition resistance and three-phase synchronism of on-load tap changers.

How does it compare with the HUAC-BYKC-III?

The KC-2008 is lighter and simpler for routine field tests. The BYKC-III adds a touch screen, automatic fault marking and Word reports.

How is data saved?

In internal memory and on a USB flash drive, including the waveforms.

Have another question? Ask our application engineers.

Request a quote

Get pricing for the Portable On-Load Tap Changer Tester

Tell us the asset ratings and site conditions. A sales engineer will reply with a recommendation and quotation.

  1. We reply within one business dayA sales engineer reads your request and asks for anything missing.
  2. You get a recommendationThe right model and options, with a datasheet and quotation.
  3. No obligationAsk about lead time, shipping and payment terms before you decide.

By submitting, you agree to our Privacy Policy. We use your details only to answer this request.

Related products

Often ordered together

All Transformer Testing →
WhatsApp Get a quote
WhatsApp